Sea Wall Update
June 22, 2015
The sea wall repair is progressing nicely.
The north side cement dock has been poured. The decorative posts that will hold the ropes and lighting will be installed later.
Work has begun on the south side. The lounge chairs have been relocated and the decking has been removed.








