Sea Wall Update
May 29, 2015
The sea wall repair has begun.
AB Dock & Deck Inc. has set up their work site on the north side lawn.
Work began the third week of April on the north side with removal of the dock wood planks. The wood posts were removed and new cement pilings were installed and cut down. The north side is prepared for the dock cement pour including electrical needs.