Riverside Terrace
Board Meeting Minutes
April 21, 2016
Certifying of Quorum & Call to Order:
At 4:06 PM on April 21, 2016, Dan Creedon called the meeting to order and roll was taken:
Present for the Board:
- Dan Creedon, President
- Pierre Forget, V President
- Dennis Rosenfeld, V President
- Tom Cassidy, Treasurer
- Barbara Rowbothem, Secretary
- Barbara Ellis, Assistant Secretary (phone)
- Sharon Dowling, Director (phone)
Absent for the Board:
- None.
Also Present:
- Lorri Hill – Royal Management
Lorri Hill began to record the minutes.
The notice of Board meeting was posted & emailed on 4/14/2016.
Motion made by Pierre Forget to waive the reading of the 3/31/2016 Minutes and approve. Seconded by Dennis Rosenfeld. All in Favor: Dan Creedon, Sharon Dowling, Barbara Ellis, Pierre Forget, Dennis Rosenfeld, Barbara Rowbotham. All Opposed: None.
Officer Reports:
- Requested proposals provided to Dennis Rosenfeld for the following:
- Motion made by Dennis Rosenfeld to get a proposal from Thyssen Krupp to replace the elevator door parts. Seconded by Pierre Forget. All in favor: Tom Cassidy, Dan Creedon, Sharon Dowling, Barbara Ellis, Pierre Forget, Dennis Rosenfeld, Barbara Rowbothem. All opposed: None.
- Motion made by Pierre Forget to run a camera through the roof drain and garage drain. Seconded by Dennis Rosenfeld. All in favor: Tom Cassidy, Dan Creedon, Sharon Dowling, Barbara Ellis, Pierre Forget, Dennis Rosenfeld, Barbara Rowbothem. All opposed: None.
- 1. Alumna Pro-fencing along west side of the garage
- 2. Don’s Plumbing to relocate gas line for the BBQ grill
- 3. Jones Awnings for awing over BBQ grill and second awning in grass area
- 4. PLA Electric – install new dock lights remove and replace lobby chandelier with fixture supplied by the association, run new line to roadside sign for light
- 5. GRGG, LLC – lobby painting, pool bathroom demo and remodel, cabinet for lobby fire panels
- 6. Oracle Elevator & Mowrey Elevator – maintenance contracts for Hall and Cab Door equipment upgrade
- 7. Atlantic Southern Paving – Mill and Pave
Construction Updates:
- City of Pompano Beach permits final inspection approved on April 13th.
- Approved payment application 17 for retention ($57,362.17) submitted to the association on April 19, 2016.
- TRC requested close-out meeting to provide final documentation and warranties-pending an approved date from the board. Draft copies of all warranties and final releases of lien provided to the board April 20, 2016.
- Association has requested that TRC conduct a final review of payment application 17.
- All documentation has been provided to Lee Burg at Becker & Poliakoff for final review.
- Dennis Rosenfeld is coordinating the painting of the exterior doors. Dates pending.
Old Business:
- None.
New Business:
- Contractor Oversight.
- Barbara Rowbothem made a motion that the board contact the owner in the event of a violation. Seconded by Tom Cassidy All in favor. All in favor: Tom Cassidy, Dan Creedon, Sharon Dowling, Barbara Ellis, Pierre Forget, Dennis Rosenfeld, Barbara Rowbothem. All opposed: None.
- Committee formed for Rule Revisions for Contractor Access: Kathy Jabusch, Betty Michael, Dave Carroll, Sharon Dowling, Barb Rowbothem. Committee will be chaired by Sharon Dowling.
Adjournment:
Motion made by Sharon Dowling to adjourn the meeting at 5:39 P.M. Seconded by Pierre Forget. All in Favor: Tom Cassidy, Dan Creedon, Sharon Dowling, Barbara Ellis, Pierre Forget, Dennis Rosenfeld, Barbara Rowbotham. All Opposed: None.
